1、 Complete vehicle
1. Corridor size: 7750x2500x3200
2. Number of passengers: 3
3. Water tank: Volume 10000l
4. Water pump: flow 40L/ S@1.0MPa
5. Blister flow: 40L/ S@0.8MPa , range ≥ 55m
2、 Chassis
1. Manufacturer: Dongfeng Motor Co., Ltd
2. Driving type: 4x2
3. Wheelbase: 3950mm
4. Engine: d4.0ns6b195
·Rated output power: 143kw
·Emission standard: National VI
5. Maximum speed: 90km / h
6. Power take-off: full power sandwich power take-off, solenoid valve control, splash lubrication.
3、 Driving room
1. Structure: Welded flat head cab with integral steel frame, fixed type.
2. Layout: single row double doors, with 3 passengers.
3. Equipment: in addition to the original vehicle equipment, it is also equipped with power takeoff switch, side marker light switch, hand throttle, etc.
4、 Topcoat
Capacity:
L water: 10000kg;
texture of material:
L high quality carbon steel plate with anti-corrosion treatment;
Type: exposed type;
Structure: welded structure, with anti sway plate inside and manhole between grids, which meets the national standard. The front and rear sealing plates, wall plates on both sides, diaphragms and anti swing plates are equipped with trapezoidal folding bars that can increase the strength.
L one is set on the tank top φ 450mm inlet hole, tank cover with quick locking and opening device.
L one DN80 overflow pipe;
L one full stainless steel floating ball liquid level indicator with display instrument on the operation instrument panel;
L a drain outlet controlled by Dn40 ball valve is set at the bottom of the tank.
(2) Equipment box
1. Structure:
·The pump room frame is of welded structure.
·The inner skin is light alloy pattern aluminum plate.
·According to the needs of equipment fixation, aluminum alloy profile fixing frame or diaphragm shall be configured.
2. Material: the pump room skin is made of high-quality carbon steel.
3. Rolling shutter door:
·The material is light alloy rolling shutter door, with light weight and good anti-corrosion performance.
·The special structure of the rolling shutter door ensures that the external rainwater is difficult to penetrate and has good sealing performance.
4. Top: anti slip checkered plate and protective fence are adopted to ensure personnel safety.
5. Cab 1: equipped with ladder for firefighters to go up and down.
5、 Fire pump and waterway system
1. Fire pump
·Model: CB10 / 40 vehicle fire pump
·Installation position: rear
·Flow and pressure: 40L/ S@1.0MPa
·Water diversion time: ≤ 35 seconds (at 7m suction depth)
2. Fire monitor
·Model: CB10 / 40
·Installation position: top of pump room
·Flow and pressure: 40L/ S@0.8MPa
·Range ≥ M
·Rotation angle: 360 °
·Pitch angle: - 15 ° - 60 °
3. Fire fighting pipeline
·Tank suction pipeline: DN100, with manual butterfly valve, right forward
·External water suction pipeline: DN100, rear mounted
·Gun outlet pipe: DN65, top up
·Hose outlet pipeline: 2xdn65, with manual ball valve, 1 on top, 1 on the left and 1 on the right
·Water injection pipeline from pump to tank: Dn40, with manual ball valve, right forward
·Fire hydrant water injection pipeline: DN65, with pipe tooth cover, right side of tank body
·Drain pipeline: it is located at the lowest part of the pump, tank and pipeline to prevent the pump, tank and pipeline from freezing and cracking under low temperature.
6、 Electrical system
1. Side marker lamps conforming to national standards are installed on both sides of the vehicle
2. The tail is equipped with corridor lights, combined tail lights and license plate lights that meet national standards.
3. Operating system: various instruments and switches are centrally arranged on the instrument panel at the tail of the pump room, including shock-resistant pressure gauge, shock-resistant vacuum gauge and water pump diversion switch, and the working principle and operation instructions of fire water system are attached on the instrument panel.
7、 Equipment allocation and layout
1. Allocation principle
·When the customer has special needs, it shall be equipped according to the customer's needs
·When customers have no special needs, it shall be equipped according to the company's enterprise standards
8、 List of basic equipment on board
2 water absorbing rubber pipes
2 sets of special tools for chassis
Suction pipe wrench 2
9、 Vehicle coating
·The exterior of the greening spraying vehicle is painted with R03 bright red;
·Fire pump pipeline is painted with R03 bright red;
10、 Onboard documents
Chassis operation manual (1 copy)
Chassis maintenance manual (card) (1 copy)
List of onboard maintenance tools (1 copy)
Operation and maintenance manual of fire pump (1 copy)